Basements
Basements built to be lived in — and to add value.
We finish lower levels across Utah County — framing through final paint, on a schedule you can plan around.
Why finish it
A basement is the least expensive square footage you will ever add to a house — the foundation and the roof are already paid for.
We finish it the way we build everything else: one crew on site from the first walkthrough to the last punch item, mechanicals and egress done properly rather than worked around, and a price agreed before anyone picks up a hammer. The standard downstairs is the standard upstairs — it should still hold up when someone looks at it closely in ten years.
Three ways to build
Choose your basement
-
The Fast Basement
A finished, move-in-ready basement on the quickest schedule we can run.
Best for: Families who need the space now.
- A locked schedule with a firm finish date
- One crew on site from framing to final paint
- Permits, mechanicals, and inspections handled
- Weekly progress photographs and a written punch list
-
Most popular
The 12-Month Basement
The same finished basement, paid for over twelve months instead of all at once.
Best for: Owners who would rather spread the cost.
- Payments split across twelve months
- A fixed price agreed before we start
- Phased so the house stays livable throughout
- The same crew and materials as every other build
-
The Money Maker Basement
A separate living space downstairs, built to bring in rent.
Best for: Owners who want the basement to pay for itself.
- Separate entrance, kitchenette, and laundry
- Planned around your city’s accessory-unit requirements
- Egress windows and sound separation between floors
- Finishes chosen to hold up to tenants
What goes in
Types of basements we build
-
Entertainment & theater rooms -
Home gyms -
Guest & in-law suites -
Rental / income suites -
Bars & kitchenettes -
Home offices
How it works
From walkthrough to handover
-
Walkthrough
We come to the house, look at the space, and listen to what you want from it.
-
Price and schedule
A fixed price and a finish date, in writing, before anyone picks up a hammer.
-
The build
One crew from framing to final paint. Permits and inspections handled, progress photographs every week.
-
Handover
We walk it with you, write up the punch list, and finish every item on it.
Questions
Before you call
How long does a basement take?
It depends on the size and what goes in. As a reference, a 1,000 sq ft lower level with two bedrooms, a full bath, a kitchen and laundry took us eight weeks. You get a firm finish date with the price, before work starts.
Do you handle permits and inspections?
Yes. Permits, mechanicals, and inspections are part of the job, not something left to you.
Can I pay over time?
Yes. The 12-Month Basement is the same finished basement with the payments split across twelve months, at a fixed price agreed before we start.
Can you build a rental suite?
Yes — a separate entrance, kitchenette, and laundry, planned around your city’s accessory-unit requirements, with egress windows and sound separation between floors.
Who will actually be in my house?
The same crew from the first walkthrough to the last punch item. We take on a small number of projects at a time so nothing gets handed off to people you have never met.
Where do you work?
Across Utah County, including Eagle Mountain and Saratoga Springs.
What does a quote cost?
Nothing. Send the address and what you have in mind, and we will come look at the space and put a number to it.
Get started
Tell us what is downstairs.
Send the address, roughly how much space is down there, and which of the three you are leaning toward. We will come look at it and put a number to it.